One factory contract covers specification, mock-up, production, phased delivery and export documents — furniture packages for villas, apartments, serviced residences and commercial fit-outs.
Different buildings, same requirement: furniture that arrives on schedule, on spec and on budget.
Show flats and full-unit packages for residential projects — repeatable per-unit pricing across phases and towers.
Durable, replaceable furniture programs with a locked SKU list, so damaged pieces reorder identically years later.
We quote against your BOQ, deliver per floor handover and supply the compliance documents your client requires.
Your drawings, our workshop — feasibility checked before quoting, mock-ups approved before mass production.
Hotel FF&E runs on a dedicated scope — see our hotel project solutions page.
Every stage has a deliverable you approve before the next one starts.
Send your bill of quantities, drawings or reference photos. We map every line to a spec and flag feasibility issues before pricing.
An itemized proposal: per-unit pricing, material specs, packing volumes and a phased delivery plan matched to your construction schedule.
One complete room or show flat set produced for sign-off. Materials, colors and finishing standards lock against the approved mock-up.
Production runs on a dedicated schedule with photo and video updates. Capacity is reserved at PO, so your timeline holds.
Completed goods are warehoused and released per building, tower or floor handover — containers arrive when your site is ready.
Full export document set, test reports where commissioned, spare-parts support and identical reorders on the locked SKU list.
Project furniture fails on coordination, not craftsmanship. We remove the coordination.
One contract, one production schedule, one QC standard and one project manager — instead of a spreadsheet of suppliers.
We hold finished goods and ship per handover milestone, so furniture never lands before the site can receive it.
ISO 9001:2015 factory system, supplier-level OEKO-TEX textiles, and third-party testing arranged per market — see certifications.
We re-spec materials and construction to hit a target per-unit cost without visible compromise — a workshop conversation, not a sales trick.
Representative project structures — scope, hard point and outcome.
Scope: complete furniture packages for serviced apartment units across multiple buildings — sofas, beds, dining and casegoods on a locked SKU list with phased delivery per building handover.
Hard point: holding identical fabric and finish across phases separated by months, so a unit furnished in phase three matches phase one exactly.
Scope: furniture for show flats and a villa cluster, built to the designer's drawings with a mock-up room approved before mass production.
Hard point: translating design intent into production specs without losing the details that sold the units — curved upholstery, mixed materials and custom dimensions.
The numbers your procurement file needs.
If your question is not here, ask us directly — we answer within 24 hours.
Project pricing starts from a full container of furniture — typically one multi-unit show flat, a villa package or a phased apartment rollout. Smaller needs are better served by our wholesale program.
Yes. For multi-unit projects we produce one complete mock-up room or show flat set for your sign-off — materials, colors and finishing standards are locked against it before mass production starts.
Yes — phased production and shipment is the standard project structure. We hold completed goods in our warehouse and release containers per building or floor handover.
Yes — hotel and hospitality FF&E has its own dedicated scope. See our hotel project solutions for the full FF&E structure, or send us your BOQ directly.
Furniture ships with assembly sheets and hardware kits, and we support your local installation team remotely. On large programs we can dispatch a supervisor for the first installation phase.
Yes. Send the drawings or BOQ — feasibility is checked by our workshop before quoting. Fully custom designs run through our OEM/ODM service with NDA protection.
Send your bill of quantities, drawings or reference photos — our project team replies within 24 hours with a preliminary proposal and a per-unit cost model.
Our WeChat location pin is more accurate than your map.